This research aims to optimize the cost and time in the Blitar National Land building by using the CPM (Critical Path Method) Method.
Building construction cannot be separated from various obstacles that cause delays in work until the cost of repairs. In its planning, both aspects need to be done appropriately to get optimal results. Cost and time control is a key aspect of construction management.